Construction Report
Select Location
  
Updated: 5/23/18 3:52 PM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Show Moving Operations

I-290 EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
IL-83 to Tri-State Tollway (I-294) 10.7 to 15.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 9:30 AM to 2:00 PM IDOT Moving Operation
IL-83 to 17th Ave 10.7 to 19.1 Minor Left lane and left shoulder closed, one or two lanes open 5/23/18 10:00 PM to 5/24/18 5:00 AM IDOT 3 mile increments
Wolf Rd to Central Ave 140.9 to 23.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 11:30 AM to 2:30 PM IDOT Moving Operation
Central Ave to Ogden Ave 23.7 to 28.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 11:00 AM to 2:30 PM IDOT Moving Operation
Pulaski Rd to Damen Ave 25.7 to 28.2 Medium Right two lanes and right shoulder closed, two lanes open 5/23/18 11:00 PM to 5/24/18 5:00 AM IDOT
Pulaski Rd to Damen Ave 25.7 to 28.2 Medium Right lane and right shoulder closed, three lanes open 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT
Entrance ramp from Homan Ave Medium All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Exit ramp to Sacramento Blvd 26.8 Medium All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Exit ramp to Western Ave 27.3 Medium All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Entrance ramp from California Ave Medium All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Exit ramp to Damen Ave 28.1 Medium All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Entrance ramp from Western Ave 28.0 Unknown All lanes and shoulders closed 5/23/18 8:00 PM to 5/24/18 5:00 AM IDOT One ramp at a time
Ogden Ave to Kennedy / Dan Ryan Expy (I-90/94) 28.4 to 29.8 Major Right two lanes and right shoulder closed, one to three lanes open 3/25/18 12:00 AM to 8/27/18 11:59 PM IDOT Long Term Closure
Exit ramp to Racine Ave 29.0 Medium All lanes and shoulders closed 3/25/18 12:00 AM to 8/27/18 11:59 PM IDOT Long Term Closure
Ramp from EB I-290 to SB I-90/94 29.6 Minor Right shoulder closed, all lanes open 11/15/17 12:00 AM to 11/30/18 11:59 PM IDOT ramp width restriction 12 feet wide; Long Term Closure
Exit ramp to SB I-90 Major All lanes and shoulders closed 5/16/18 12:00 AM to 8/15/18 11:59 PM IDOT Long Term Closure
Exit ramp to Taylor St Medium All lanes and shoulders closed 5/15/18 11:59 PM to 8/20/18 11:59 PM IDOT Long Term Closure
Kennedy / Dan Ryan Expy (I-90/94) to Canal St 29.8 to 30.1 Major Left two lanes and left shoulder closed, one or two lanes open 12/20/17 12:00 AM to 6/30/18 11:59 PM IDOT Long Term Closure
Entrance ramp from SEB Kennedy Local 29.9 Major All lanes and shoulders closed 1/19/18 12:00 AM to 5/30/20 11:59 PM IDOT Long Term Closure
Canal St to Wells St 30.1 to 30.4 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 11:00 AM to 2:30 PM IDOT Moving Operation

I-290 WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Wells St to Peoria St 30.5 to 29.6 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 9:00 AM to 1:00 PM IDOT Moving Operation
Canal St to Racine Ave 30.1 to 29.2 Medium Left three lanes and left shoulder closed, up to one lanes open 5/23/18 11:00 PM to 5/24/18 5:00 AM IDOT Weave right to left in 2 lane section.
Entrance ramp from SB Canal St 30.1 Medium All lanes and shoulders closed 10/10/16 7:00 AM to 8/31/18 11:59 PM IDOT *** Long Term Closure ***
Exit ramp to SB I-90 30.0 Major All lanes and shoulders closed 5/16/18 12:00 AM to 8/15/18 11:59 PM IDOT Long Term Closure
Exit ramp to Taylor St Medium All lanes and shoulders closed 5/15/18 11:59 PM to 8/20/18 11:59 PM IDOT Long Term Closure
Entrance ramp from SEB Kennedy Local 29.7 Major All lanes and shoulders closed 1/19/18 12:00 AM to 5/30/20 11:59 PM IDOT Long Term Closure
Peoria St to Morgan St 29.6 to 29.5 Major Right two lanes and right shoulder closed, two lanes open 12/14/17 12:00 AM to 6/30/18 11:59 PM IDOT Long Term Closure
Morgan St to Central Ave 29.5 to 23.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 9:00 AM to 1:00 PM IDOT Moving Operation
Central Ave to Wolf Rd 23.7 to 16.5 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 9:00 AM to 11:59 AM IDOT Moving Operation
17th Ave to Wolf Rd 19.1 to 16.5 Minor Right lane and right shoulder closed, one to three lanes open 5/23/18 10:00 PM to 5/24/18 5:00 AM IDOT
17th Ave to Wolf Rd 19.1 to 16.5 Medium Right two lanes and right shoulder closed, up to two lanes open 5/23/18 11:59 PM to 5/24/18 5:00 AM IDOT
Exit to WB I-88 (Chicago-Kansas City Expy) 16.4 to 44.3 Medium Various lanes closed 3/28/13 12:00 AM to 12/31/50 11:59 PM IDOT The movement of oversize and overweight loads is restricted. Vehicle height restricted to 14' 6", width to 12'.
Tri-State Tollway (I-294) to IL-83 15.5 to 10.7 Medium Left lane or right lane and both shoulders closed with partial ramp closures 5/24/18 9:00 AM to 1:30 PM IDOT Moving Operation

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Wed May 23 2018 15:53:02 CDT