NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
Kane County (Illinois)
| NWB US-20 from IL-31 (+0.2 miles) to Randall Rd (-0.5 miles)
|
|
Medium |
Various lanes closed |
02/25/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| NWB US-20 from Mclean Blvd to Weld Rd
|
|
Medium |
Various lanes closed |
01/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge widening |
| NWB US-20 at Mclean Blvd
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Interchange reconstruction and lighting |
| SEB US-20 from Weld Rd to Mclean Blvd (+0.4 miles)
|
|
Medium |
Various lanes closed |
01/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Bridge widening |
| SEB US-20 from Randall Rd (+0.5 miles) to IL-31 (-0.2 miles)
|
|
Medium |
Various lanes closed |
02/25/13 07:00 AM to 08/30/14 11:59 PM |
IDOT |
Expect lane restrictions for roadway improvement. |
| SEB US-20 at Mclean Blvd
|
|
Medium |
Various lanes closed |
06/01/12 07:00 AM to 12/31/13 11:59 PM |
IDOT |
Interchange reconstruction and lighting |
| EB US-30 from Orchard Rd to US-34
|
|
Medium |
Various lanes closed |
04/24/13 07:00 AM to 08/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches. |
| EB US-30 from IL-31 to Railroad St
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, widening, bridge rehabilitation, and traffic signals. |
| WB US-30 from US-34 to Orchard Rd
|
|
Medium |
Various lanes closed |
04/24/13 07:00 AM to 08/31/14 11:59 PM |
IDOT |
Roadway reconstruction, adding lanes, bridge replacement and signals. Max width 9 feet 6 inches. |
| WB US-30 from Railroad St to IL-31
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 10/31/14 11:59 PM |
IDOT |
Roadway reconstruction, widening, bridge rehabilitation, and traffic signals. |
| NB IL-25 at Pinelands Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| SB IL-25 at Pinelands Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| NB IL-31 at Mooseheart Rd
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| NB IL-31 at Red Gate Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| NB IL-31 at Metra RR
|
|
Medium |
Various lanes closed |
02/15/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 9' 6" |
| NB IL-31 at IL-72
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| SB IL-31 at IL-72
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| SB IL-31 at Metra RR
|
|
Medium |
Various lanes closed |
02/15/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 9' 6" |
| SB IL-31 at Red Gate Rd
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 09/21/13 11:59 PM |
IDOT |
One lane closed. |
| SB IL-31 at Mooseheart Rd
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| EB IL-38 from Kirk Rd to Kress Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| WB IL-38 from Kress Rd to Kirk Rd
|
|
Medium |
Various lanes closed |
03/01/13 07:00 AM to 08/31/13 11:59 PM |
IDOT |
Max width 10 feet 6 inches. One lane closed. |
| WB IL-38 from Kautz Rd (-0.1 miles) to Kautz Rd
|
|
Medium |
Various lanes closed |
11/01/12 07:00 AM to 10/31/13 11:59 AM |
IDOT |
Grade separation, roadway reconstruction, drainage, traffic signals. |
| NB IL-47 from Cross St to IL-56
|
|
Minor |
All lanes and shoulders open |
09/17/12 07:00 AM to 10/13/13 11:59 PM |
IDOT |
Lanes narrowed to 10' wide, all lanes open |
| NB IL-47 at Cross St
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Construct right turn lanes, traffic signal, barrier wall |
| NB IL-47 at Virgil Ditch 2 (Silver Glen Rd -0.1 miles)
|
|
Major |
Various lanes closed |
05/13/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
Bridge replacement. Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 11 feet 6 inches. |
| SB IL-47 at Virgil Ditch 2 (Silver Glen Rd +0.1 miles)
|
|
Major |
Various lanes closed |
05/13/13 07:00 AM to 10/15/13 11:59 PM |
IDOT |
Bridge replacement. Traffic will be restricted to one lane and controlled by temporary traffic signals. Max width 11 feet 6 inches. |
| SB IL-47 from IL-56 to Cross St
|
|
Minor |
All lanes and shoulders open |
09/17/12 07:00 AM to 10/13/13 11:59 PM |
IDOT |
Lanes narrowed to 10' wide, all lanes open |
| SB IL-47 at Cross St
|
|
Medium |
Various lanes closed |
09/03/12 07:00 AM to 08/30/13 11:59 AM |
IDOT |
Construct right turn lanes, traffic signal, barrier wall |
| EB IL-64 at IL-47
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/21/13 11:59 PM |
IDOT |
Intersection reconstruction |
| EB IL-64 from Burlington Rd to Randall Rd
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Fiber optic cable installation and traffic signal interconnection. |
| EB IL-64 from 7th St to 7th Ave
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Traffic signal upgrade |
| EB IL-64 from 7th Ave to Dunham Rd
|
|
Medium |
Various lanes closed |
04/16/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Roadway widening, traffic signals, lighting. One lane closed. Max width 9 feet 6 inches. Expect long delays. |
| WB IL-64 from Dunham Rd to 7th Ave
|
|
Medium |
Various lanes closed |
04/16/12 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Roadway widening, traffic signals, lighting. One lane closed. Max width 9 feet 6 inches. Expect long delays. |
| WB IL-64 from 7th Ave to 7th St
|
|
Medium |
Various lanes closed |
07/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Traffic signal upgrade |
| WB IL-64 from Randall Rd to Burlington Rd
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Fiber optic cable installation and traffic signal interconnection. |
| WB IL-64 at IL-47
|
|
Medium |
Various lanes closed |
04/02/12 07:00 AM to 06/21/13 11:59 PM |
IDOT |
Intersection reconstruction |
| EB IL-72 in Hampshire from French Rd to Romke Rd (+0.4 miles)
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Installation of span wire. |
| EB IL-72 from Randall Rd to 2nd St
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Road Widening Project More information |
| EB IL-72 at IL-31
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| EB IL-72 at Rock Road Dr
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Intersection improvement and traffic signal modernization. |
| WB IL-72 at Rock Road Dr
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Intersection improvement and traffic signal modernization. |
| WB IL-72 from 2nd St to Randall Rd
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Road Widening Project More information |
| WB IL-72 at IL-31
|
|
Medium |
Various lanes closed |
05/06/13 07:00 AM to 11/11/13 11:59 PM |
IDOT |
Intersection improvement More information |
| WB IL-72 at Randall Rd
|
|
Medium |
Various lanes closed |
11/20/12 07:00 AM to 06/11/13 11:59 PM |
IDOT |
Intersection improvements and traffic signals. One lane closed. |
| WB IL-72 in Hampshire from Romke Rd (-0.4 miles) to French Rd
|
|
Medium |
Various lanes closed |
04/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Installation of span wire. |
| NB CR-11(French Rd) at Burlington Creek
|
|
Minor |
All lanes and shoulders open |
02/23/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions -- Motorists with vehicles that exceed combination of 5 or more axles or 33 tons should find alternate routes. |
| SB CR-11(French Rd) at Burlington Creek
|
|
Minor |
All lanes and shoulders open |
02/23/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions -- Motorists with vehicles that exceed combination of 5 or more axles or 33 tons should find alternate routes. |
| NB CR-46 at Allen Rd (-0.2 miles)
|
|
None |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions: Single unit - 22 tons; 3 or 4 axles - 29 tons; 5 or more axles - 36 tons |
| SB CR-46 at Allen Rd (+0.2 miles)
|
|
None |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
Weight restrictions: Single unit - 22 tons; 3 or 4 axles - 29 tons; 5 or more axles - 36 tons |
| NB Austin Ave at Indian Creek
|
|
Medium |
All lanes and shoulders closed |
05/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Bridge Replacement. Detour in place. |
| SB Austin Ave at Indian Creek
|
|
Medium |
All lanes and shoulders closed |
05/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Bridge Replacement. Detour in place. |
| NWB Big Timber Rd at Randall Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SEB Big Timber Rd at Randall Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| NWB Burlington Rd from IL-64 to Traffic Management Center
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Fiber optic cable installation and traffic signal interconnection. |
| SEB Burlington Rd from Traffic Management Center to IL-64
|
|
Medium |
Various lanes closed |
08/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Fiber optic cable installation and traffic signal interconnection. |
| WB Downer Pl from Water St to Stolp Ave
|
|
Medium |
All lanes and shoulders closed |
01/02/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Historic bridge removal and replacement |
| WB Downer Pl from Stolp Ave to Hoyt Pl
|
|
Medium |
All lanes and shoulders closed |
01/02/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Historic bridge removal and replacement |
| EBIL-72 at Randall Rd
|
|
Medium |
Various lanes closed |
11/20/12 07:00 AM to 06/11/13 11:59 PM |
IDOT |
Intersection improvements and traffic signals. One lane closed. |
| NB Farnsworth Ave from New York St to Molitor Rd
|
|
Minor |
Various lanes closed |
05/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Installing an interconnect system |
| SB Farnsworth Ave from Molitor Rd to New York St
|
|
Minor |
Various lanes closed |
05/01/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Installing an interconnect system |
| EB Galena Blvd at IL-56
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
New bridge deck and traffic signal installation. |
| WB Galena Blvd at IL-56
|
|
Minor |
Various lanes closed |
04/02/12 07:00 AM to 06/28/13 11:59 PM |
IDOT |
New bridge deck and traffic signal installation. |
| EB Hinckley Rd at Jericho Rd
|
|
Medium |
All lanes and shoulders closed |
07/02/12 07:00 AM to 08/31/13 07:00 PM |
IDOT |
Rehabilitation of 2 bridges superstructures. Detour posted. |
| WB Hinckley Rd at Jericho Rd
|
|
Medium |
All lanes and shoulders closed |
07/02/12 07:00 AM to 08/31/13 07:00 PM |
IDOT |
Rehabilitation of 2 bridges superstructures. Detour posted. |
| EB Keslinger Rd at Mill Creek
|
|
Minor |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
All lanes open, weight restrictions in place. Weight limits: single unit - 10 tons; 3 or 4 axles combinations - 15 tons; 5 or more axle combinations - 19 tons |
| WB Keslinger Rd at Mill Creek
|
|
Minor |
All lanes and shoulders open |
09/24/12 07:00 AM to 12/31/13 11:59 PM |
Other |
All lanes open, weight restrictions in place. Weight limits: single unit - 10 tons; 3 or 4 axles combinations - 15 tons; 5 or more axle combinations - 19 tons |
| WB Mcdonald Rd from Robin Glen Ln to Thornwood Way (+0.1 miles)
|
|
Minor |
Various lanes closed |
05/01/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Resurfacing and patching |
| EB Mooseheart Rd at IL-31
|
|
Minor |
Various lanes closed |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| WB Mooseheart Rd at IL-31
|
|
Minor |
All lanes and shoulders open |
05/13/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Channelization and traffic signal installation. |
| NB Orchard Rd from US-30 to Jericho Rd
|
|
Minor |
Various lanes closed |
01/02/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Widening and reconstruction |
| NB Orchard Rd from Jericho Rd to Randall Rd
|
|
Minor |
Various lanes closed |
01/02/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Traffic signal upgrades |
| SB Orchard Rd from Jericho Rd to US-30
|
|
Minor |
Various lanes closed |
01/02/12 07:00 AM to 05/31/13 11:59 PM |
IDOT |
Widening and reconstruction |
| NB Randall Rd at Keslinger Rd
|
|
Medium |
Various lanes closed |
11/05/12 07:00 AM to 07/31/13 11:59 PM |
Other |
Motorists are advised to exercise caution will traveling through the work zone, pay attention to flaggers, watch for equipment entering and exiting on Keslinger Rd and expect increased travel times. |
| NB Randall Rd from Main St to Dean St
|
|
Minor |
Various lanes closed |
05/02/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Fiber optic interconnect cable/traffic signals. |
| NB Randall Rd at Big Timber Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SB Randall Rd from Corporate Pky to IL-72
|
|
Minor |
Various lanes closed |
05/20/13 07:00 AM to 06/28/13 11:59 PM |
Other |
Pavement Resurfacing; Flagging Operation |
| SB Randall Rd at Big Timber Rd
|
|
Minor |
Various lanes closed |
04/08/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
East bound right turn lane and traffic signal modernization. |
| SB Randall Rd from Dean St to Main St
|
|
Minor |
Various lanes closed |
05/02/11 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Fiber optic interconnect cable/traffic signals. |
| SB Randall Rd at Kaneville Rd
|
|
Medium |
Various lanes closed |
11/05/12 07:00 AM to 07/31/13 11:59 PM |
Other |
Motorists are advised to exercise caution will traveling through the work zone, pay attention to flaggers, watch for equipment entering and exiting on Keslinger Rd and expect increased travel times. |
| EB Wilson St from Batavia Ave (IL-31) to Island Ave
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Widening and resurfacing. |
| WB Wilson St from Island Ave to Batavia Ave (IL-31)
|
|
Medium |
Various lanes closed |
05/01/13 07:00 AM to 11/29/13 11:59 PM |
IDOT |
Widening and resurfacing. |